Swamp>

On Line/Standby
With a new Z-axis cable in place, along with a little tuning, this muthu is ready to work. New work table guards built and in place. I need another Kurt vise for this baby, which will mount to the the billet aluminum sub-table. This allows muti-fixturing locations which are doweled in, permiting faster changeovers/setups.